API drill pipe made in china manufacturer 2 3 / 8 drill pipe for water well coal mining drill pipe
1.Description:
-Water well drill pipe
OD: 76mm
Grade: G105
Length:3m
Thread type: 2 3/8''
-Water Well Drill Rod joints are quenched and tempered after rough machining, and surface nitriding treatment after finishing, that makes the joints more wear-resistant and easy to disassemble without thread sticky, breaking and cracking.
2.Application:
The purpose of the drill pipe is to transport the drilling mud to the drill bit and together with the drill bit to raise, lower or rotate the bottom hole device. Drill pipe must be able to withstand enormous internal and external pressure, twisting, bending and vibration. In the process of drilling water wells, the drill pipe can be used multiple times.
3.Specifications:
|
4.The Photo of products
Related Product
- Plastic caps plugged at the two sides of pipe ends
- Should be avoided by the steel strapping and transport damage
Glorytek Industry ( Beijing) Co., Ltd is a professional manufacturer and supplier of drilling equipment and drilling tools with over 20 years experience. We are supported and assisted by highly experienced R & D team and engineers that enable us to complete all the assigned projects successfully as per clients’ requirements.
Our factory covers an area of 250,000 square meter, construction area is about 150,000 square meter, having machining machinery, CNC processing center, friction welding machine, testing equipment etc. over 200 sets and more than 600 employees.Our products have been exported more than 60 countries around the world.
Pre-sale services:
1) Selecting equipment type;
2) Designing and fabricating the products in accordance with the special requirements of the clients;
3) Providing construction and technology consultations or working out proper construction schemes for those new, special or difficult projects.
After-sale services
Improve the added value of our products, and let the clients free from the using troubles:
1) Assisting the clients preparing for the first construction scheme;
2) Installing and testing the equipment;
3) Training the first-line operators on site;
4)Supplying spare parts with cost.